START REHABILITATION/ REPLACEMENT WEST OF 17 ST.

ARROW (formerly ACRWC) will replace existing wastewater sewer pipe and install new wastewater sewer pipe west of 17 Street NE, which will pass beneath the CN rail line running diagonally NE through the figure below. The goal of the project is to address the poor structural condition of the pipes and to increase pipe capacity.

More details

START REHABILITATION/ REPLACEMENT EAST OF 127 ST

Arrow Utilities (formerly ACRWC) will replace existing wastewater sewer pipe and install new wastewater sewer pipe at above locations. The goal of the project is to address the poor structural condition of the pipes and to increase pipe capacity.

START REHABILITATION/ REPLACEMENT EAST OF RR 245

Arrow Utilities (formerly ACRWC) will replace existing wastewater sewer pipe and install new wastewater sewer pipe at above locations. The goal of the project is to address the poor structural condition of the pipes and to increase pipe capacity.

START REHABILITATION/ REPLACEMENT WEST OF 82 STREET

Arrow Utilities (formerly ACRWC) will replace existing wastewater sewer pipe and install new wastewater sewer pipe at above locations. The goal of the project is to address the poor structural condition of the pipes and to increase pipe capacity.

PARKLAND GRAVITY SEWER REHABILITATION

Arrow Utilities (formerly ACRWC) will replace existing wastewater sewer pipe and install new wastewater sewer pipe at above locations. The goal of the project is to address the poor structural condition of the pipes and to increase pipe capacity.

BAUMONT TWIN PIPE EXTENSION

Arrow Utilities will increase sewer capacity at the above location. Total length is 3kms from west of Range Road 244 to East of 9 Street in Leduc.

ARROW Utilities is constantly working to identify opportunities to innovate, adapt, and advance its operations to serve its customers. Through capital projects, we make upgrades to existing facilities that ensure their reliability, integrity, and efficient operations.